July saw things really kick into high gear. Foundation was prepared and poured.
Basic framing of the home was begun and finished.
Week of 7/7
Plumbing rough in for foundation
Additional lot cleanup and tree removal
Lot, West Side
Lot, East Side
Here is the Backyard after being completely cleaned up
West Side
Looking at West side from East
Center Looking West
Center Looking East
East Side
Looking at East from West
Much work has been done on the plumbing rough in
Kitchen/Dining
Kitchen/Dining
Kitchen/Dining
Kitchen/Dining
Master Bathroom
Study
Looking in from Garage
Main Water to house
Main Sewer line
Main Sewer line
Week of 7/14
Finalize plumbing, form beams in ground, lay polyvinyl, lay rebar for sidewalks
and driveway,
and post tension cables for foundation
Lot, West Side
Lot, East Side
Kitchen Wall
Study
Driveway
Garages
Garages 2
3rd Car garage
Master Bedroom
In the shot above you can see the walkout bay window on the back wall
Post Tension Cables
Post tension cables are used instead of rebar to reinforce the foundation.
They will be tightened to 30 thousand pounds after the concrete sets.
Week of 7/21
Final inspection of foundation Wednesday 7/23
Pour foundation, Thursday 7/24
Begin Framing Friday 7/25
Lot, West Side
Lot, East Side
Dining Room
Study
Kitchen
Family Room
Family Room 2
Master Bedroom
Garages
Framing (Pictures from Saturday 7/26)
Front
Front 2
Kitchen
Framing (Pictures from Sunday 7/27)
Lot, West Side
Lot, East Side
Front
Study
Garages
Master Bedroom
Family Room
Week of 7/28
Much framing work this week, windows installed, roof decked,
wrong decking installed
Also, the wrong brick was delivered,
Arkansas Red instead of Arkansas Rose